    燃油燃气锅炉的安装有哪些要求?
    来源:http://www.jnlzsb.com 发布时间:2021-03-06

    燃油燃气锅炉从安装前期的施工准备一直到工程验收任何阶段都有需要注意的问题,都需要按照步骤一步步的来完成。下面小编给大家总结了一些燃油燃气锅炉的安装要求,一起看一下。
    From the construction preparation in the early stage of installation to the project acceptance, there are problems that need to be paid attention to in any stage, which need to be completed step by step. The following is a summary of the installation requirements of some oil and gas boilers. Let's have a look.
    (1)锅炉在安装施工前,依据规程先办理锅炉安装审批手续,待质量技术监督局审批后,施工队做好施工准备。
    (1) Before boiler installation and construction, the boiler installation approval procedures shall be handled according to the regulations. After the approval of quality and Technical Supervision Bureau, the construction team shall make good construction preparation.
    (2)组织施工人员学习,熟悉锅炉图纸与锅炉安装有关方面的技术资料,规范、规程后方可进行施工
    (2) Organize the construction personnel to study, be familiar with the boiler drawings and technical data related to boiler installation, and carry out the construction only after the specifications and procedures
    (3)锅炉在水平运输时,要使枕木高于锅炉基础,保证基础不受损坏。
    (3) When the boiler is transported horizontally, the sleeper shall be higher than the boiler foundation to ensure that the foundation will not be damaged.
    (4)燃烧器管路安装:燃烧器自身的燃油管路已接好,且留有进,回油两个燃油软管接口,安装时只需将供,回油管接上即可。
    (4) Burner pipeline installation: the fuel pipeline of the burner itself has been connected, and there are two fuel hose interfaces for oil inlet and return. When installing, just connect the oil supply and return pipes.
    (5)控制柜安装:控制箱上汇集了燃烧器的开关按扭,燃烧器的程序控制器以及自动操作和保护装置的接线端,其控制线已接好,用户只需接通外来总电源。
    (5) Installation of control cabinet: the switch button of burner, the program controller of burner and the terminal of automatic operation and protection device are assembled on the control box. The control line has been connected, and the user only needs to connect the external main power supply.
    (6)水泵安装:将水泵抬到基础上就位后,用垫铁垫平找正,然后用混凝土将地脚螺栓灌注好,待混凝土强度达到75%时,再复查水泵不平度,紧好地脚螺栓。
    (6) Water pump installation: after the water pump is lifted to the foundation and put in place, it shall be leveled and aligned with pad iron, and then the anchor bolts shall be poured with concrete. When the concrete strength reaches 75%, the unevenness of the water pump shall be rechecked and the anchor bolts shall be tightened.
    (7)烟囱、压力表、水位表等等问题,都是需要在安装时严格按照锅炉厂家的安装要求行事。
    (7) Chimney, pressure gauge, water level gauge and other issues, are required to be installed in strict accordance with the boiler manufacturer's installation requirements.
    所有的工作或者要求都是为了施工顺利的完成,大家一定要根据要求来做。
    All the work or requirements are for the smooth completion of the construction, we must do according to the requirements.